Analysis of precautions and instructions for assembled seismic mounts(2)

Update:24 Aug 2019
Summary:

According to the installation load provided by the user […]

According to the installation load provided by the user, the anti-vibration bracket manufacturer fixes the indicator plate of the assembled bracket with the upper and lower positioning blocks at a position corresponding to the installation load, so that the assembled bracket is temporarily in a rigid state. After the assembled bracket pipe has been cleaned and hydrostatically tested, the upper and lower positioning blocks are removed before the pipeline can be put into use. When the pipeline starts to run, first check whether the assembled bracket positioning block is removed, and then check the indicator board from the installation load to the working load of the emulsified asphalt equipment.
After the pipeline is put into normal operation, check whether the displacement of the fabricated bracket under the working load is consistent with the design. After the pipeline stops running, check whether the assembled bracket indicator plate is reset to the position where the load is installed. When the pipeline or equipment is displaced, as long as it is within the pre-selected load displacement, regardless of the displacement change, they can pass the constant force spring bracket. And always get a constant support.
As a result, the fabricated bracket does not introduce new additional pressure on the pipe or equipment, thus avoiding major equipment and safety incidents. In the course of use, the standard work of the assembled bracket should be strictly followed to prevent a safety accident.